20041128-allegro-01-midpanellaydown:
Mid-panel weighted down. On top of each spar I used a 1/4" strip of EPP and ensured that the tip carry-through segments were well weighted, as well as the joiner bar end segments. I should have placed more weight directly on top of the spar span-wise. Also make sure your foam strips are FLAT, otherwise weight may not be evenly distributed and your spar caps may note be cured evenly.
NOTE: Make sure your TE's on the tip and ribs are flat against the work surface. If they are not, you may want to shim the LE's slightly. This will reduce the chance of WASH-IN creeping into the build. You will build in some WASH-OUT during the sheeting phase.
20041128-allegro-01-midpanellaydown:
Mid-panel weighted down. On top of each spar I used a 1/4" strip of EPP and ensured that the tip carry-through segments were well weighted, as well as the joiner bar end segments. I should have placed more weight directly on top of the spar span-wise. Also make sure your foam strips are FLAT, otherwise weight may not be evenly distributed and your spar caps may note be cured evenly.
NOTE: Make sure your TE's on the tip and ribs are flat against the work surface. If they are not, you may want to shim the LE's slightly. This will reduce the chance of WASH-IN creeping into the build. You will build in some WASH-OUT during the sheeting phase.